Description
SUMMARY * Proven history of helping to bring companies to the forefront of World Class Maintenance and Asset Management solutions through the intelligent implementation (entire CMMS from manually written WO's) and improvement of CMMS / EAMS such as, SAP, MAXIMO, MP2, 7i, EAM (Infor), JD Edwards, Ignition, COGZ, and AvantisPRO. * Responsible for planning and adherence to department budgets by assuring all projects and turn-arounds comply with all cost and schedule constraints (current and projected). * Provided upgrade support for MAXIMO by executing Functional Test Scripts. Implemented intelligent equipment and spares (for stocked and non-stocked items) nomenclature to establish hierarchies to provide ease-of-use, future expansion, and a logical roll-up of costs. 111 * Direct management of on-site maintenance and production personnel (union & non-union), including a wide array of contractors, with a strong emphasis on safety policy compliance (as per Plant Policy, OSHA, and MSHA). * Key participant in regulatory compliance pertaining to OSHA and MSHA. Participation in assessment, implementation, and monitoring of Process Safety Management protocols. Served as PSM Management of Change Coordinator. * Strict adherence to SOP's (i.e. - Inspection and Maintenance Instruction Sets, Line-Break Procedures and Permits) and cGMP (i.e. - documentation & procedural requirements). * Implementation, supervision, and improvement of Confined Space and LO/TO requirements through evaluation, labeling, equipment, training, documentation, verification, and improvement. * Implementation and support of ISO certification served as Process Electrical and Instrumentation Auditor. * Project Management for installation of new components and systems, as well as major equipment turn-arounds. Create MS Project Schedules to assure strict adherence to critical pathways and on-time delivery of a successful S/D or TAR closure. Then complete a Post-Project Evaluation, and a thorough examination of Lessons Learned. * Procure, inspect and receive repair parts and materials to minimize down-time. Pre-stage equipment, parts, materials, and personnel to the highest extent possible. Creation of Job Kits (usually referenced to a Work Order Number) for routine projects and repairs. * Maintain Life Safety Systems such as, Electrical Generators and associated Switchgear, Fire Systems (including Air Locked Water Sprinkler, Halon, and Soap Based Foam types (among others). * Produced detailed AutoCAD Drawings for fabrication, installation, as-built documentation, and revisions to existing drawings. Experienced with Horizontal Ball Mills, Vertical Roller Crushers, Large Dust Collectors, Kilns, Preheater, Belt and Screw Conveyors, Drag Conveyors, Bulk and Palletizer Shipping Systems, Rotary and Hammer Type Mills/Crushers, Airslides, plus much more Material Processing/Conveying Equipment. Maintenance Planner March 2003 to December 2004 Cambridge-Lee Industries, Inc. Reading, PA * MP2 Access 2000 (intranet), and 7i (internet) implementation and support. This included (but was not limited to) equipment numbering system inception and entry, job task and safety (LO/TO/TO) information writing and entry, and attachment of all pertinent drawing and instructional documents (to either the task or equipment file) to be associated with work orders. * Aided in organizing and cataloging spare parts into MP2 Software, which was mapped into SAP . * Developed detailed, step-by-step instruction sets for complex maintenance procedures in metal extrusion industry. * Preparation of comprehensive job packages, including reservation and staging of repair parts. * Design and specification of mill equipment utilizing AutoCAD. * HVAC installation, diagnosis, and repair. Maintenance Coordinator/Planner (Promotion) ** October 1999 to December 2002
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Merck Paragon Rock Tenn Gsk Pa + Nj | Systems Validation Maintenance Planner Scheduler | 1/2011 - 1/2015 |
Clii Lafarge Wyeth/Pfizer Pharmaceuticals Urs Collegeville | Maintenance Planner | 1/2003 - 1/2011 |
Mallinckrodt (Geo Imc) | Maintenance Coordinator Planner Leader | 1/1993 - 1/2003 |