Rss

Roger D

Metal Fabricator, Structural Metal Products

Occupation:

Metal Fabricator, Structural Metal Products

Education Level:

Some College Units Completed

Will Relocate:

YES

CollapseDescription

Summary To obtain a permanent position with a company in Maintenance, Welding, Machining, Tool & Die bringing experience, a positive attitude, and willingness to acquire new knowledge. As Manufacturing Engineer. I worked with work standards in Geno as well as SAP. As well as setting this plant up for full production operation set for 10/2/2013. Helping setup brand new 200 Million dollar plant Lay out of all work cells. Set up Robotic cells. Set travel speed wire feeds heat to get size of welds needed per prints. This is a brand new Plant going into Production we are a 6 Sigma company as well as 5 S lean manufacturing. Use of POR/E Modeling for Dimensional checks with SAP. Geno Writing Work Standard Procedures. Setting up weld cells adjusting fixtures to accept different weldments one fixture and correcting when needed. Continuous Improvements at all times talking each one of the associates. Writing weld procedures giving weld test to all associates work procedures in a lean manufacturing keeping safety first this company is 6 sigma environment writing safety into all procedures. Working with vendors if parts are not correct Caterpillar has a plus or minus 1mm tolerance plant wide. In writing all procedures with lifting tools of loading and unloading to and from work stations. Also safety had to be in cooperated into all Standard Work Procedures. Supervised 22 workers in making parts for bridges making sure all parts are made to prints and shipped to different depts. I ran three depts. The New Kinetic table for webs and flange's 168 feet length secondary members which makes my cross frames and diaphragms. Assigned work to each shift in each department as well as Welders fitter's and laydown area when needed plus two leadsmen to make sure assignments were done. Checked all CNC programs before start up. The New Kinetic is also replacement of PLC when needed for CNC drilling and milling plasma HD along with five torches when cutting up to 8 inch thick plates. Checking Programs on the Quick Mill as well another 10 head CNC troch 100' table. Fill out time cards and time on each job in shop. Flanges Cross Members Stiffener's Web Plates Splice plates fabrication of other components. Welds preheating per DOT states each state has different codes AWS 1.5 codes PQR plates and so on this was a 24/7 operation company. 5 s lean manufacturing. Did some resistance welding from 5/8 stud to 1 inch stud. Left for better Job

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom