Description
PROFILE SENIOR PROJECT MANAGER Accomplished Operations and Project Manager with demonstrated success in the Oil and Gas industry executing large-scale process and performance improvements that support long-term and enterprise-wide growth by developing innovative solutions, devising intelligent contracting strategies and executing projects in response with industry challenges. Strong background in Drilling R&D, Land Rig and Equipment Fabrication, Platform and pipeline Decommissioning, Well and Subsea well abandonments, Downed platform recovery and Subsea well intervention. Managed 49 structure removals, over 343 well abandonments, 29 SCP - Bubble mitigations (drillouts) and 35 pipelines decommissioned to date. Served on the Decommissioning Team: 3 large 8-pile downed structure removals in avg 350' WD, 5 Subsea well PA. A cross-functional leader who can lead teams by establishing the direction and motivating team members, creating an atmosphere of trust, leveraging diverse views, coaching staff, and encouraging improvement and innovation. Excellent collaborative behaviors developed in world leading decommissioning projects where strong teamwork and organization is essential to ensure excellence in project execution. ACCOMPLISHMENTS Oversaw the Challenges of Offshore Decommissioning. Directed the removal of 33 offshore structures, plugged and abandoned 143 wells and decommissioned 35 pipelines to date. Created and managed bidding, cost analysis, procedures, project planning and vendor contracts and work orders. IMPACT: Lowered project day rates and expendables increased efficiencies reduced exposure and corralled cost created savings of over 50M in decommissioning cost within 5 years Cost-effective Removal of Well Conductors & Subsea Wellheads: Led the Enhancements of the Internal Multistring Cutting Tool. Developed procedures and SOP for operations. Engineered and completed the cut and removal of over 200 wells and 15 platform jackets from 15' below mud line. IMPACT: Reduced rig up time and down time tool reliability and reduced cut time from 1.5 to .25 days enabled market increase from 4 to over 32 customers. Designed and Built Automated Camera System for Carbide Wheels. Analyzed and evaluated the processes and documentation. Developed the framework to install an automated camera system. IMPACT: Reduced photograph time from four hours per wheel to eight seconds provided measurements proper documentation Spearheaded Strategies to Several IDLE Decommissioning Projects. Collaborated with the decommissioning team to develop guidelines and solutions. Oversaw the preliminary and final decommissioning planning. IMPACT: Removed 3 down platforms, capped 24 bubbling well and PA'd 5 Subsea wells met federal guidelines achieved operational excellence cost estimation & efficiency 6 Sigma Lean Strategies and Regulatory Compliance: Operational and API/ISO Restructuring. Revamped the maintenance schedules on equipment, Welding machines, Heavy equipment, overhead cranes etc. Implemented quality system that maintained API and ISO standards and allowed the company to maintain and upgrade certifications and licenses. IMPACT: Improved mast and substructure build time by 100% Reduced man hours by 26% reduced turnaround achieved savings of $250,000 per week in operations cost improved efficiency controlling cost Engineered and Executed the Re-design of the Visual Single Point Cutter (VSPC). Conceptualized, designed, built and upgraded the controls and monitoring system, hydraulic system, electric drive and structure. IMPACT: Reported accurate data improved product line led to major technological advancements in PDC inserts

Accomplishments
Highlights:

Keywords
- Consulting
- Research
- Project Management
- Project Manager
- Planning
- Engineering
- Management
- Senior Project Manager
- Offshore
- Research and Development
- Oil and Gas
- 6 Sigma
- Change Managment
- PMP
- Project Managment Professional
- Manufacturing
- Fabrication
- International
- Drilling
- P&A
- Well Plug and Abandonment
- Coiled Tubing
- CTU
- Snubbing
- Hydraulic work over unit
- HWO
