Rss

Harry H

Power Generating Plant Operator - 20 Years of Experience - Near 34461

Occupation:

Power Generating Plant Operator

Location:

Lecanto, FL

Education Level:

Some College Units Completed

Will Relocate:

YES

CollapseDescription

EXPERIENCE SUMMARY Navy: Nuclear rated Electronics Technician/Reactor Operator on two nuclear submarines and one nuclear prototype. Operated, maintained, and repaired reactor controls and protection equipment. This work included calibration and alignment of individual I&C components and loops for equipment which monitored and controlled all reactor controls and protection equipment, steam generator level, feedwater, and all other related controls and systems. In Reactor Controls Division, was the senior petty officer on one submarine and the Leading Petty Officer on the other submarine. Both are positions of supervision, management, and training. Served in the Maintenance Training Group for the S1C Nuclear Prototype, performing both maintenance of the plant and training of officer and enlisted students. Commercial/DOD/DOE: At the Crystal River Nuclear Plant (CR3), within 6 months was a Chief (Foreman) I&C Technician. Supervised and performed maintenance on all I&C equipment and loops. Revised I&C procedures. Worked in both the Cold and Hot Metrology Labs as a qualified Metrology Technician. While in Operations, certified as a Reactor Operator on all equipment and systems and certified to perform reactor startups to 5% power before transferring to I&C Department. Wrote the initial Revision 0 I&C procedures for the Westinghouse 7300 Process Analog Control System at the Waterford Nuclear Power Plant and the Shearon Harris Nuclear Power Plant. At the Perry Nuclear Power Plant, was the Assistant Lead in the I&C Procedure Group of about 70 procedure writers to develop all of the initial Revision 0 I&C procedures (about 800 procedures). Have been a procedure writer in many procedure efforts that include incorporating Improved Tech Specs, plant modifications, Corrective Actions, Operating Experience, License Amendments, FSAR changes, ISFSI, power uprate, etc. Have been qualified to perform 50.59 Screening Reviews at a number of plants. Have written and revised all types of Operations Department and Maintenance Department procedures at many plants, using Microsoft Office Suite, Passport-Asset Suite, and others.

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom