Description
Processed Received customer designs, new castings, assumed responsibility for and managed processing of prototype castings, Develop and implement production machining plan including location and machine usage to process piece parts of proposed quantities to promote Just in Time deliveries. I was responsible for establishing new production work at 5 plants throughout Wisconsin. Interfaced with customers to explore new designs and define Failure Modes Effects Analysis for these production run pieces. Responsible for continued working relationships with customers by fostering a team atmosphere and creating an open door policy for all team members and instituting a no IDEA goes unnoticed via the Investigate, Define, Establish viability, and Achievability and machined castings through machining cells for fuel control production. As a Certified Greenbelt lead cell operations and was the cell facilitator for process improvement using 6-Sigma requirements. Attended 2 years of vocational education and maintained a 3.96 GPA while working this position. Prospect and compete for clients write proposals for prospective clients set up contracts defined level of service for customers train & certify employees in proper cleaning procedures (hospital surgical suites and emphasis on sanitation floor care and maintenance of equipment) budget development and compliance inventory purchasing control negotiation and management of service contracts for maintenance repair and cleaning of their facilities Directed all park maintenance which included hands-on supervision of maintenance at 5 city parks totaling 2500 acres with 30 onsite buildings with site wells including playgrounds landscape recreation fields amphitheater tennis courts and pools. Responsible for major renovation of facilities including facility updates and pool-to water park renovation. Coordinate and direct subcontractors and contractors Developed and implemented Nuclear Hardness Assurance and Surveillance Program against Nuclear Weapons Effects of Blast Thermal Radiation and Electromagnetic Pulse for the B-2 Bomber. I personally directed physical standards for structures electronics and air vehicle crew via design of shields hardness by selection and design of electronic piece parts. Define electrical hardening through shielding of wiring and shunts to ground. Through manufacturing engineering I instituted correction and reviewed design of repairs and changes to follow contractual design to requirements. I was part of the first flight and test flight teams as the lightning strike and static electricity abatement coordinator taking measurements of pre and post flight system protection for radar signature integration.