Description
Oversaw The Hoover Dam By-Pass Colorado River Bridge Project, Las Vegas, NV - Oversaw the creation of concrete clear span arch bridge spanning the Colorado river nearly 1,500 feet down-stream from the Hoover Dam, US 95 Bypass. Responsible for all field operation on the Arizona side which included installation of pier footing for pre-cast columns on the near vertical slopes of the Black Canyon. Supervised all site preparation and egress construction for Employee and material hoisting to pier sites. Supervised construction of slick-line for all concrete placements. Supervised the construction of all concrete anchor system for Cableway Crane system. the creation of a super-elevated multi track rail yard facility on the south side of Seattle. Responsible for the construction of false-work and shoring. Responsible for the construction of decking and box girders with post-tension. Responsible for the installation of mechanical rail system hardware. Responsible for all Construction Crew activity On-Site.

Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Ttg Utilities Inc. | Concrete Superintendent 77 | 7/2015 - 4/2016 |
Balfour Beatty Construction Co. | Assistant Superintendent | 10/2013 - 5/2015 |
Webber Construction, Llc. | Structural Concrete Foreman | 10/2013 - 10/2013 |

Accomplishments
Highlights:

Keywords
