Description
PROFILE Plumbing & Fire Protection Department Manager, who brings over 30 years of expertise in the design of plumbing and fire protection systems for commercial, industrial and high-rise residential style projects. As a Lead Plumbing & Fire Protection Engineer, I would oversee the design of projects including system evaluations, meeting with clients, load calculations, equipment selection and sizing, code review, system coordination with other trades. PLUMBING: * Write proposals to secure new projects * Maintained close contact with the Clients during all phases of the projects. * Wrote or directed the writing of Pre-Construction narratives describing the scope and equipment relative to the discipline, for review by Contractors/Owner/Architect. * Evaluated the available existing utilities, including water, sewer, natural gas, storm sewer and coordinated our designs to be compatible with them. * Review projects, internally, in the office, for any coordination issues/errors or missing information, prior to submitting the "Permit" and Construction Documents" sets. * Write project specifications, address RFI's (requests for information) and assist in resolving any issues arising in the field during construction. * Attend Pre-Construction meetings at the site, to review the plans and discuss the construction schedules with the Owner/Architect/Contractor. * Perform site visits for determining the condition of existing buildings and the systems, for prospective buyers of a building. This sometimes was for a Client who already bought a building and we would do a survey to determine what systems require maintenance or replacement. Fire Protection: * Review each project for the fire protection requirements and discuss with the local Authorities Having Jurisdiction and in cases where applicable, the Owner's Insurance Underwriters. * Perform Code Analysis. * Evaluate the existing municipal water supplies for their ability to support the anticipated systems, designed for the project. * Size fire pumps and determine routing of all standpipe mains throughout the building, producing riser diagrams, for the standpipe systems. * Calculate the sprinkler/standpipe water demands to confirm the available water supply is adequate. * Designed Clean Agent systems, including FM-200, Inergen, Fog systems (by Orr), VESDA Detection Systems, Pre-Action, Wet and Dry systems. * Met with the Owner/Architect to discuss progress of the designs throughout the project schedule. * Write project specifications and review the shop drawings/hydraulic calculations submitted by the installing Fire Protection Contractor. Day Project Quicksilver 1 loads of 4MW expandable to 30 MW of concurrent maintainable high density racks up to and 80,000 Health Sciences Campus Renovation Phase III (Wright Hall, Pound Hall, and Hudson Clinic) SF Academic Building (Henry County Campus) McDonough Georgia 36,000 SF MEP/FP design for the construction of a 150,000 SF new student Netzero High Performance Computing Center residence facility. The $18.9 million