Plant Layout Specialist , Conceptual Front end Mdel Loading Designer , Concrete Civil and Structural Early layout

Occupation:

Product Design Engineer

Location:

Hempstead, TX

Education Level:

Trade School

Will Relocate:

No

CollapseDescription

SUMMARY OF QUALIFICATIONS I have extensive Piping Lead and Lead Piping checker experience. I have an in depth knowledge of the procedures in running 3D projects. I have an abundance of Vessel and Piping and structural knowledge. I work well with all the other departments to bring the client's needs and wishes to the fore front of the design effort. I have used many 2D and 3D systems and am acutely aware of the ins and outs of the PDS and PDMS, SP3D requirements to make a smooth transition from a comment in a meeting to a routed line that passes stress and meets O.S.H.A. standards. Water Plant design on SP3D.

Right_template4_bottom

CollapseWork Experience

Right_template4_bottom

CollapseEducation

SCHOOL MAJOR YEAR DEGREE

Dow Chemical SP3D Modeling 2010 Trade School Degree
Acteva PDMS 2005 Trade School Degree
South Texas Jr. College Fire Administration 1 1977 Trade School Degree
Right_template4_bottom

CollapseAccomplishments

Highlights:

I have laid out many plants and been a piping lead on many Projects and been a Lead Piping Checker . I had a couple of jobs as a Man-hour construction estimator . My accomplishments are counted by what I can do like issuing 200 isometrics a week for 4 months to keep the construction companies busy without any lost time.

Companies I like:

Ralph Parsons, Dow Chemical, BASF

Left_template4_bottom

CollapseJob Skills

Left_template4_bottom

CollapseKeywords

Left_template4_bottom

CollapseResponsibilities

Usually I start with the Rudimentary P&ID's and add drain valves and check valves to pumps and Strainers where needed. Then I pick the Process Engineers brains for some idea of the vessels vertical or horizontal and diameter and length . Then I add the skirts or legs I think are appropriate . Then I need a property plat of what size of real estate we are held too for the addition or plant . It may be a revamp so a laser scan may be in order . Finally I set up a pipe rack and vessel locations which requires several pipe rack levels and expansion loop locations . That should make up the starting place . I can hand sketch all of this faster than anyone and break it up into areas so my pipers can put the plot Plan in the 3D Model and start routing pipe and adding pipe supports and guides for early stress and a first round model review with all the disciplines attending . This process is fairly fast and makes the Company look good to the client and they may have changes needed . Now in a few short weeks we have gotten to our first milestone and the Engineers may buy different equipment so the changes start happening .
Left_template4_bottom